January 24th, 2011
Beginning on 1/25/11 from 0200-0500 EST, 4t Networks Data center engineers will move traffic off its legacy backbone network to a new backbone transport network affecting the Suwanee, GA Data Center. 4t Networks will leave the legacy backbone in-service and simply promote the new solution into service during the change window.
The purpose for this change is to employ more advanced technologies and a new transport design that will better protect our Internet transport against external faults (fiber-cuts for example) without noticeable impact to customers.
Minimal impact to customer services is anticipated with the possibility of momentary packet loss during the maintenance window.
While we have taken every precaution to minimize complications during this event, there exists a certain amount of risk and the possibility of service disruption. We are committed to providing the highest possible level of service; therefore, we strive to increase client satisfaction and productivity through our proactive approach to customer notification.
Posted in All | No Comments »
January 10th, 2011
We will be upgrading the underlying Operating System for your server on Saturday, January 15th starting at 10:00 PM ET until 2:00 AM ET. The upgrade process will require your server to be rebooted once. Your services will be unavailable at some point during this maintenance window, which should not last more than 10 minutes. If you have any questions or concerns, please let us know.
Posted in All | No Comments »
November 10th, 2010
A flaw in the popular ProFTPD FTP server potentially allows unauthenticated attackers to compromise a server. The problem is caused by a buffer overflow in the pr_netio_telnet_gets() function for evaluating TELNET IAC sequences.
4t Networks has applied patches to all services affected. Details of bug are linked below.
ProFTP
Bug 3521 – Telnet IAC processing stack overflow
http://bugs.proftpd.org/show_bug.cgi?id=3521
Parallels
ProFTPD Remote Code Execution Vulnerability and Exploit
http://www.parallels.com/products/plesk/ProFTPD
If you have any questions or concerns, please let us know.
Posted in All | No Comments »
November 9th, 2010
We will be upgrading the underlying Operating System for your server on Saturday, November 13th starting at 10:00 PM ET until 3:00 AM ET. The upgrade process will require your server to be rebooted once. Your services will be unavailable at some point during this maintenance window, which should not last more than 10 minutes.
In addition, if you have a Lotus Domino account and reside on one of the following servers, we will be performing some emergency hardware maintenance, the server will be down during a portion of and possibly the entire maintenance window. No changes will be made to your account.
Server: internet10/eapps
Server: internet11/eapps
Server: internet12/eapps
If you have any questions or concerns, please let us know.
Posted in All | No Comments »
September 15th, 2010
We will be upgrading the underlying Operating System for your server on Saturday, September 25th starting at 11:00 PM ET until 1:00 AM ET. The upgrade process will require your server to be rebooted once. Your services will be unavailable at some point during this maintenance window, which should not last more than 10 minutes. If you have any questions or concerns, please let us know.
Posted in All | No Comments »
May 26th, 2010
We will be upgrading the underlying server software for your account on Saturday, June 5th starting at 10:00 PM ET until 2:00 AM ET. The upgrade process will require your server along with your account to be rebooted. Your services will be unavailable at some point during this maintenance window, which should not last more than 10 minutes.
In addition, if you have a Lotus Domino account and reside on one of the following servers, we will be upgrading the Lotus Domino version from R7 to R8.5. The Domino server will be down for the entire duration of the window. Please note that no changes will be made to your configuration information such as the site ip address, server ip address, domain name, server name, etc. This will remain the same.
Server: internet4/eapps
Server: internet6/eapps
Server: internet7/eapps
Server: internet8/eapps
Server: internet10/eapps
Server: internet11/eapps
Server: internet12/eapps
If you have any questions or concerns, please let us know.
Posted in All | No Comments »
April 29th, 2010
We will be upgrading these servers on Saturday, May 8th, 2010 from 10:00 pm – 2:00 am ET.
Server : DRH02/WS02
Server : internet1.4tdomino.com
During this time, all related services will be unavailable. The upgrade will be from Lotus Domino version R7 to Lotus Domino version R8 (8.5). Please note that no changes will be made to your configuration information such as the site ip address, server ip address, domain name, server name, etc. This will remain the same. Please feel free to contact us if you have any questions or concerns.
Posted in All | No Comments »
April 22nd, 2010
This is notification that our data center provider, Quality Technology Services will be making an emergency upgrade of a network hardware component in one of the core routers during a maintenance window on Wednesday, 22 April 2010 from 0200 to 0400 ET. During this time, you may experience suboptimal routing, but should not experience any downtime. If you have any question or concerns, please let us know.
Posted in All | No Comments »
April 18th, 2010
We will be making changes to our routing protocol and infrastructure on Saturday, April 24th, at 10:00 PM ET. Due to the nature of this change and the potential impact it may cause, we are anticipating an outage of all services for approximately 15 minutes. The actual outage may be shorter. During this time your account will be unavailable. Once the work is complete, your services will be restored to their original state. If you have any question or concerns, please let us know.
Posted in All | No Comments »
March 7th, 2010
During the planned upgrade of DRH01, we ran into a few problems which prevented us from finishing within a reasonable amount of time. We decided that the best plan of action was to revert the changes and resolve the issue in our lab before proceeding. We have rescheduled the upgrade of the server to R8 (8.5) for Saturday, March 20th, 2010 from 10:00 pm – 2:00 am ET. We apologize for the inconvenience.
Please note that no changes will be made to your configuration information such as the site ip address, server ip address, domain name, server name, etc. This will remain the same. Please feel free to contact us if you have any questions or concerns.
Posted in 4t Domino | No Comments »